Ontdek meer
Over deze vacature
Functie omschrijving
Large Projects Offshore (LPO):
Based on the Energy agreement, where the targets and intentions for the transition to a more renewable energy supply are set, the Roadmap Offshore wind energy 2030 and the ambition to realise additional windcapacity prior to 2030 a roll-out strategy is being prepared for the medium term, including the IJmuiden Ver (DC) projects. This results in a commitment for TenneT to realise at least 2x (with potential up to 5) 2GW HVDC Grid Connection Systems which bring the power from offshore wind-farms in the North sea to the Dutch electricity grid to be commissioned between 2028 - 2030.
The 2GW program:
Europe's energy transition is among the greatest challenges of our time. Its goal: To make Europe the first climate-neutral continent by 2050 at the latest. The Netherlands and Germany have therefore set themselves ambitious goals to expand offshore wind energy: as early as 2030, Germany and the Netherlands want to reach a capacity of 30 and 22.2 Gigawatts, respectively. Energy from offshore wind farms in the European powerhouse North Sea will play in this a crucial role. TenneT guarantees that this energy will reach the mainland - and in the most environmentally friendly way possible. That is why we have developed the 2GW program with a unique transnational approach. And thus increase the pace and efficiency of the energy transition.
Between 2028 and 2031, TenneT will realize the following 525 kV bipolar connections of high-voltage direct current (HVDC) with a capacity of 2 GW each in designated wind areas in the Dutch and German North Sea. These projects are part of the 2GW Program.
More information: https://www.tennet.eu/nl/het-2gw-program
De opdrachtgever(s)
Europe's energy transition is among the greatest challenges of our time. Its goal: To make Europe the first climate-neutral continent by 2050 at the latest. The Netherlands and Germany have therefore set themselves ambitious goals to expand offshore wind energy: as early as 2030, Germany and the Netherlands want to reach a capacity of 30 and 22.2 Gigawatts, respectively. Energy from offshore wind farms in the European powerhouse North Sea will play in this a crucial role. TenneT guarantees that this energy will reach the mainland - and in the most environmentally friendly way possible. That is why we have developed the 2GW program with a unique transnational approach. And thus increase the pace and efficiency of the energy transition.
Functie eisen
We would like to receive the personal motivation of the candidate and CV in English.
TenneT is looking for an experienced contract manager with 10 years of experience in this role (for example with experience with companies like Siemens, BAM, Boskalis, etc.).
Minimum 6 years experiences as Contract Manager for major construction projects;
Verifiable experiences in the Offshore business (pré);
Verifiable experiences with FIDIC yellow/silver (must!) and other similar international standards;
Legal and/or Commercial and/or Technical background / university degree;
Open and transparent (to-the-point) in the communication.
Language: English.
Competenties
Pro-active;
Accurate;
Task orientated;
Good communicator, a people person;
Organized, analytical, transparant and a person with positive energy.
Extra info
Startdatum: 01-08-2024 also 01-09-2024 is an option;
Einddatum: 31-07-2025
Optie tot verlengen: Ja
Aantal uur per week: 40 uur
Duty station for this position is Arnhem Rijnpoort (Monday, Tuesday and Wednesday), other days hybrid. Interational travel can happen, not on a frequent base;
Dit is een herhaalde aanvraag